701 CANYON DR, STE 110

COPPELL, TX 75019

2018 © JACOBS & ASSOCIATES

 

DETAILS

DALLAS, TX

A. MACEO SMITH

NEW TECH HIGH SCHOOL

A. MACEO SMITH

NEW TECH HIGH SCHOOL

DALLAS, TX

DETAILS

 

Type   |   Academic: K-12

Client  |   Dallas ISD (2008 Bond Program)

Area    |   63,500 SF of Renovation

Convert an existing High School to a Technology Based High School with an emphasis on team learning. 
The Renovations include:
 - Creation of larger rooms within existing shell.
 - The installation of windows along corridor walls in all classrooms.
 - Elimination of lockers and installation of tack boards thru hallways.
 - Creation of a technology / corporate look to existing campus.
 - Creation of Work rooms and group study alcoves around campus.
 - Use of special lighting, carpet tiles, special ceiling tiles, designer based raceways and accent colors.
Entry Lobby was redesigned to better comply with ADA requirements.
Entrance to the Media Center was redesigned to allow entrance without doors.
Acoustical materials were installed to deaden acoustically live areas.

TO TOP